Guangzhou Jin Lun Electric Equipment Co.,Ltd

19 Years Professional Heat Pump Manufacturer!

 

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsAir Cooled Chiller

15p 30KW Air Cooled Chiller Plant For Hotel Central Air Conditioning

15p 30KW Air Cooled Chiller Plant For Hotel Central Air Conditioning

    • 15p 30KW Air Cooled Chiller Plant For Hotel Central Air Conditioning
    • 15p 30KW Air Cooled Chiller Plant For Hotel Central Air Conditioning
    • 15p 30KW Air Cooled Chiller Plant For Hotel Central Air Conditioning
  • 15p 30KW Air Cooled Chiller Plant For Hotel Central Air Conditioning

    Product Details:

    Place of Origin: Guangzhou China
    Brand Name: Meeting
    Certification: CE ISO CCC UKAS,ROHS
    Model Number: MDK150D

    Payment & Shipping Terms:

    Minimum Order Quantity: 5 PCS
    Price: Negotiation
    Packaging Details: Plywooden case
    Delivery Time: 15 days
    Payment Terms: T/T, L/C WESTERN UNION
    Supply Ability: 800/MONTH
    Contact Now
    Detailed Product Description
    Materail: Coated Matel Contactor: Fuji Brand
    Copper Thick: 0.8-1mm Compressor: Copeland
    Water Temperature: 7 Degree Control: Wifi Function Support
    High Light:

    water chiller machine

    ,

    industrial water chiller

    15p 30KW cooling water cooled chiller plant for hotel central air conditioning

     

    Contact: Alinna | Heat Pump Professional Provider
    Mobile/Wechat: +86 13922152741

     

    Technology Specification  

    Model No. MDK150D
    Rated input power 10.4KW
    Rated cooling capacity 30KW
    Rated voitage 380V/50HZ
    Rated current 21A
    Rated outlet water temperature 12 degree
    Maximum outlet water temperature 7 degree
    Compressor Copeland

     

    Remark: The test conditions of above parameter :dry bulb temperature :20℃,wet bulb temperature :17℃, Initial water temperature        
     

    About us:

    1). We were established in 2001.

    2).We are a professional heat pump manufacturer,Located arround baiyun Air port

    3). We are trading on Meeting Brand ,Meeting heat pump Well-know brand we operate in Europe market

    4). Our company has been inspected and certificated by TUV and SGS.

    5). We are the one of the first manufacturers whose heat pumps are with top COP gaining grants from Chinese government.

    6). We pass ISO9001 quality management system and ISO14000 environment protection system

    7). Our testing laboratory can test heat pump up to 60KW heating capacity and create testing air temperature condition during -25DegC~45DegC,according to EN14511 standard.

    9). Our leading products: Air to water heat pump , DC inverter heat pump, High water temperature heat pumps

    Monoblock house heating heat pumps ,Split heat pump ,Super low noise heat pump

    Heat pump dryer ,Ground source heat pump , water to water heat pump , swimming pool heat pump

     

    15p 30KW Air Cooled Chiller Plant For Hotel Central Air Conditioning


    QC
    1 .  Complying with ISO standard. Quality Ensured .
    2 . Complete Inspection for each unit before out of factory , covering water system and electricity detection and testing , ensuring 100 % right product before shipment .
    3 . Strict quality control during production . We have liquid soap detection , halogen detection , electrical detection and water - soaking detection during production to avoid gas leakage and electrical problems .
    4 . Full inspection on bigger parts such as compressors, condensers, evaporators, expansion valves , flow switches, controllers etc .. Selection inspection for small parts such as sensors, pressure switches etc ..

     

    A Packaging Details
    Carton and Wooden Package,

    B Payment Terms
    T/T
    L/C (for container order only)

    C Delivery Time
    15 working 15 days after arrival of down payment

     

     

    15p 30KW Air Cooled Chiller Plant For Hotel Central Air Conditioning

     

    FAQ

     

    Q1. Can I have a sample order for Heat pump or Water tank?

    A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

    Q2. What about the lead time?

    A:Sample needs 3-10days, mass production time depend on the products'quantity.

    Q3.Do you offer guarantee for the products?

    A: Yes, 12 months since the heat pump depart from the port of loading (Refer to the Bill of Lading).
     

    Contact Details
    Guangzhou Jin Lun Electric Equipment Co.,Ltd

    Contact Person: Alinna

    Send your inquiry directly to us (0 / 3000)

    Other Products